Chemical Blending · Arleta, California

Your formula,
our tanks.

Bring a spec, get a batch. Liquid or dry, lab verified, packed to your label or ours. Every batch releases against a written spec with a Certificate of Analysis — no exceptions, no "close enough."

Liquid
Liquid blending

Agitated stainless and poly tanks from 55 gallons to bulk. Heated, cooled, and inert-blanketed options available.

Dry
Dry blending

Ribbon and paddle blending for powders, granules, and salts. Sieved, homogenized, and moisture controlled.

Lab
On-site analytical

In-house chemists develop, match, and verify formulas. Titration, pH, specific gravity, viscosity, and solids.

Packaging
Private label

Quarts through 275-gallon totes, packed under your brand or ours. Label design, print, and application in-house.

How It Works

Spec to skid in five steps.

Most customers come to us with one of three things: a formula, a sample of what they're running now, or a performance target. Any of those is enough to start.

01

Scope

Send a formula, an SDS, or a sample of what you run today. We sign an NDA before anything moves.

02

Lab work

Our chemists build or match the formula, then write a release spec with measurable pass/fail limits.

03

Sample batch

You run a trial quantity on one line. We adjust until it performs the way you need it to.

04

Production

Full batch blended to the locked spec, QC tested, and released with a Certificate of Analysis.

05

Resupply

Formula stays on file. Reorder by name — same spec, same lab release, every time.

55–6K
Gallon batch range
Qt–275
Package sizes
CoA
On every batch
ISO
9001:2015 process

What We Blend

Chemistry we run every week.

Alkaline & Acid Cleaners

Soak, spray, and electrocleaner formulations for ferrous and non-ferrous parts. Low-foam and high-foam builds.

Surface Finishing Chemistry

Plating additives, brighteners, passivates, and sealers blended to plating-shop tolerances.

Water Treatment Blends

Coagulants, flocculants, and pH adjustment packages formulated to a plant's own water chemistry.

Acid & Caustic Dilutions

Sulfuric, hydrochloric, nitric, phosphoric, and sodium hydroxide cut to your working concentration.

Sanitizers & Food-Grade

NSF-compliant cleaners and sanitizers for food, beverage, nutritional, and personal care production.

Maintenance & Specialty

Degreasers, descalers, rust preventatives, and shop-specific formulations built to order.

Quality & Documentation

If it isn't documented,
it didn't happen.

Every blend runs under our ISO 9001:2015 quality management system. Raw materials are verified on receipt, batch records are written as the batch is made, and nothing ships until the lab signs the release.

Your customers' quality depends in part on ours. We take that seriously enough to pay for the audits that prove it.

ISO 9001:2015 NACD Responsible Distribution NDA on request Lot traceability

Certificate of Analysis

Issued on every production batch, showing tested values against the written release spec.

Safety Data Sheet

GHS-compliant SDS authored for your finished product, under your brand name if private labeled.

Technical Data Sheet

Use rates, operating parameters, compatibility notes, and handling guidance for your operators.

Lot Traceability

Raw material lots tied to finished batch numbers, retained and retrievable on request.

Retain Samples

Held from every batch so a question six months out has a physical answer, not a guess.

Packaging

Packed how your plant uses it.

Container, closure, and label are part of the spec — not an afterthought. Tell us how the product gets handled on your floor and we'll pack it to match.

Discuss packaging

Quarts & Gallons

Case-packed for point-of-use dispensing, bench work, and distributor resale.

5-Gallon Pails

Open-head and tight-head, UN-rated where the classification requires it.

55-Gallon Drums

Poly and steel, new or reconditioned. Pump and closure options on request.

275/330 Totes

IBC totes with container management and empty-container return programs.

Bulk Delivery

Tanker delivery into your day tank for high-volume commodity chemistry.

Private Label

Your brand on the drum — label design, printing, and application handled here.

Common Questions

Before you send a spec.

What's the minimum batch?

Production batches start at 55 gallons. Lab and trial quantities can be much smaller — we'd rather you test on one line before committing to a drum program.

Do you sign NDAs?

Yes, before any formula changes hands. Your formula stays yours — we blend it, we don't sell it to anyone else.

Can you match a product I already buy?

Usually. Send a sample and the SDS. Our lab reverse-engineers performance, not proprietary trade secrets, and builds a formula that does the same job on your line.

How long does a first batch take?

Lab work is typically 1–2 weeks depending on complexity. Once the spec is locked, production and release usually run within the same week as the order.

Who owns the formula?

If you brought it, you own it. If we developed it for you, ownership is spelled out in writing before development starts — no surprises later.

Can you handle the waste side too?

Yes. Our Environmental Services group handles hazardous and non-hazardous waste transport and empty container management — same company, same paperwork trail.

Related Services

Send us a spec.
We'll tell you straight if we can build it.